Bridging the Gap from Design to Operation
Successful projects start with sound planning and end with flawless integration. Our Commissioning services are designed to evaluate your power system and provide essential planning and verification services. GS Green Energy manages the transition from cold checks to full grid synchronization, ensuring every component is compliant with industry codes and standards.
Our Comprehensive Commissioning Lifecycle Includes:
Energization & Stability Monitoring: Overseeing the final charging of the substation and analyzing voltage, active power, and reactive power during the initial load flow.
Pre-Commissioning (Cold Checks): A rigorous investigation of the system’s design and physical installation to ensure all construction work plans have been met.
Functional Interlock Verification: To check for severe disturbances and ensure that mechanical/electrical interlocks work correctly under different contingency conditions.
Primary Injection Testing: Verifying the entire protection loop—from primary conductors to final trip circuits—to provide coordination with optimum sensitivity.